To complete this project Syblon
Reid performed concrete canal lining repair and replacement,
replacement of valves ranging in size from 6" inches
to 72" inches in diameter, and the construction of various
concrete access and vault structures.
Throughout the duration of this water project
there were several milestone completion dates corresponding
to water outages within various agencies' regions. These milestones
carried liquidated damages if not met. All construction milestones
were met through commitment to work multiple shifts, six days
per week, rain or shine.
|