Reservoir 12 Tank Conversion consisted of the installation
of two new post stressed concrete water tanks 4.2 MG each, grading
of site, installation of inlet and outlet piping with pressure reducing
station. Construction of control building, paving and landscaping
of the surrounding area.
|
|
 |