Sewer Lift Station
Elliott Homes, Inc., a successful Northern
California Developer, chose Syblon Reid to construct a sewer lift
station for the Villages at Zinfandel residential subdivision development.
Rather than tying in new sewer lines to the existing sewer line,
which was too deep, Syblon Reid constructed an upgraded sewer lift
station.
Syblon Reid excavated a 7,400 cubic
yard pit to install the forty foot deep wet well. The wet well was
installed, along with tie-in of the existing sewer line to the new
wet well.
Surface improvements included a new
control building, MCC and standby generator, masonry wall, and paving
of the site.
This project was completed in ninety
calendar days, beating the allowed project completion time of one
hundred-twenty calendar days.
Technical elements of this project include:
- 7,400 cubic yards of excavation
- Tie-in of existing sewer line
- New control building
- MCC and standby generator
- Masonry wall
- Site paving
|