In north Sacramento the construction of a diverted water way and storm water detention basin was needed by Gateway West, LLC. They chose Syblon Reid to perform the required excavation, storm water detention basin construction, installation of pumps, mechanical bar screen, automatic service gate, and a back-up generator. Syblon Reid constructed a discharge structure and associated piping in the adjacent canal.

Technical elements of this project included:

  • 500,000 cubic yards of excavation
  • pump installation
  • mechanical bar screen installation
  • automatic service gate installation
  • back-up generator installation
  • discharge structure construction