In north Sacramento the construction
of a diverted water way and storm water detention basin was needed
by Gateway West, LLC. They chose Syblon Reid to perform the required
excavation, storm water detention basin construction, installation
of pumps, mechanical bar screen, automatic service gate, and a back-up
generator. Syblon Reid constructed a discharge structure and associated
piping in the adjacent canal.
Technical elements of this project included:
- 500,000 cubic yards of excavation
- pump installation
- mechanical bar screen installation
- automatic service gate installation
- back-up generator installation
- discharge structure construction
|