South Placer Municipal Utility District (SPMUD) was experiencing very costly maintenance fees for their existing lift station in Placer County, California. SPMUD chose Syblon Reid to perform this design-build delivery project, which involved designing and constructing a new facility, in addition to performing the abandonment of the existing lift station. The Syblon Reid design-build team performed engineering, surveying, and design analysis to provide SPMUD with an effective gravity flow system and virtual elimination of future maintenance costs for this portion of their sewer system. Technical aspects of the project included:
SPMUD was very pleased whith the outcome of this project and stated that they would be happy to have Syblon Reid perform future projects as they become available. |
|
|