Parker Development was approaching
the limit of their existing sewer lift station capacity and required
the installation of an additional sewer force main. Parker Development
contracted with Syblon Reid to complete this lift station expansion
project.
The expansion of this sewer lift station, which was
originally constructed by Syblon Reid in 1999, included the installation
of over 5,500 linear feet of 18" inch sewer force main pipeline,
the expansion of the existing lift station with three new vertical
pumps, a new standby generator and channel grinder.
|