Emergency Slide Repair

Projects

Emergency Slide Repairs

As a result of severe weather, five landslides occurred on El Dorado Irrigation District’s Hydro-Electric project.

An emergency contract, approved by FEMA and FERC, was implemented to repair the landslides providing stable access to the Atkins Powerhouse and removing the threat to the water conveyance system.

Construction methods implemented included: specialized excavation, rock anchors, drainage ditches, wire mesh fabric, erosion control fabric, seeding, crib wall, soldier piles and lagging, and geo-grid.

These extensive repairs were completed at remote locations without negative environmental impacts.

Home   |   About Us   |   Company & Culture   |   Project Solutions   |   How We Partner   |   Affiliations   |   Careers   |   Subcontractors   |   Contact   |   Sitemap
Corporate Location
1130 Sibley Street
Folsom, CA 95630-3223
Contact Information
Telephone
Email info@scro.com
Business Inquiries
inquiries@srco.com
Copyright © 2017 Syblon Reid. All Rights Reserved
Website development by 480east