Dutch Flat Canal Fyke Nets

Projects

Dutch Flat Canal Fyke Nets

As part of a relicensing effort lead by HDR, Inc., Syblon Reid provided preconstruction and construction services for the installation of a fish collection structure on the Dutch Flat Canal System.

The installation required a 2-day outage. Reinstallation required only a 1-day outage each time.

The scope of work included the following definable features of work:

  • Constructability reviews, cost estimating, and scheduling.
  • Detailing, fabrication, and installation/removal of the fish collection frame work, including walkways and access platform in June 2010.
  • Assisting biologists in the installation of the Fyke Nets.
  • Removing the nets and structure in September 2010 and reinstalling them in the spring of 2011.
  • Final removal of all the structure and other appurtances in the fall of 2011.


The only vehicle and equipment access to the site was via a ¼ mile stretch of the canal.

Home   |   About Us   |   Company & Culture   |   Project Solutions   |   How We Partner   |   Affiliations   |   Careers   |   Subcontractors   |   Contact   |   Sitemap
Corporate Location
1130 Sibley Street
Folsom, CA 95630-3223
Contact Information
Telephone
Email info@scro.com
Business Inquiries
inquiries@srco.com
Copyright © 2017 Syblon Reid. All Rights Reserved
Website development by 4EightyEast