Storm Drain, Pump Station and Basin

This project consisted of excavating 500,000 cubic yards to construct a new storm water detention basin. Syblon Reid performed the excavation without wells or a pumped dewatering system, a first for this area. This provided significant dewatering cost savings for Gateway West and the City of Sacramento.

 

This project also involved a cast-in-place pump station with four each 100 horse power pumps to discharge the storm water. This project was evaluated, bid, and to some degree constructed from preliminary drawings. Syblon Reid assisted the engineer in developing the final drawings for the Sump 17 Detention Basin.