San Juan Water District 72" Raw Water Bypass
For San Juan Water District, the work consists of the construction of approximately 3,500 feet of 72-inch, 522 feet of 60-inch and 460 feet of 42-inch welded steel pipelines including related appurtenances such as a 12 foot diameter surge tower over 121 feet in height, combination air vacuum relief valves, drains, access ways, flow meters and vaults, associated electrical improvements, shutdown and tie-into existing 72-inch, 60-inch, and 42-inch pipelines.
This project was needed to provide a complete operable facility for the conveyance of raw water to the City of Roseville and San Juan Water District.