This project included the construction of mechanically
stabilized keystone earth wall embankment approaches, 350 foot cast-in-place
concrete bridge approaches, and installation of 763 feet of steel guardrails
and handrails. In addition, Syblon Reid installed the 130-foot, 35 ton
prefabricated steel truss center span bridge.