|
Syblon Reid performed the demolition of the
existing steel bridge structure and constructed a new 140 foot long by
40 foot wide flat slab bridge over a live canal. The structure was supported
on driven concrete pilings. Syblon Reid constructed this bridge in phases
to keep portions of the existing bridge in use and maintain consistent
traffic flows.
|