San Lorenzo River Bridge
This was a public works project for the City of Santa Cruz. Syblon Reid constructed a 3-span 300' prefabricated steel truss pedestrian bridge over the San Lorenzo River. The pier and abutment foundation is an 84" CIDH up to 130' deep. A significant challenge on this project was that access to the site and construction activities required special environmental consideration and mitigation measures.

In Case of Emergency




